Technical data
Installation
56
Operating manual 743-221-01 version 01.0 - 09/2013
Machine head lubrication
1. The oil level in the oil reservoir (1) must not drop below the marking min.
2. If necessary, fill oil through the drill-holes in the inspection glass up to
the marking max.
Fig. 34: Oil reservoir 2 - machine head
6.6 Putting into operation
After completion of the installation work a sewing test should be made.
• Plug in the mains plug.
• Threading in the needle thread
• Thread in the hook thread.
• Turn the main switch on.
The control unit is initialized.
• Start the sewing cycle, chapter 5.15
(1) - Oil reservoir 2 (2) - Drill-holes
ཱ
Risk of injury due to pointed items and glare
Turn off the main switch before threading in the
needle and hook thread.
Do not look into the light source.
DANGER