Instructions / Assembly

PG.3
J
J
J
2”
2”
Because it is an adjustable frame, not all
predrilled holes on the telescoping bars and
vertical frames will line up.
(approximately 2” from the top and bottom receiving tubes)
bolt head
03-AG72LTP 2016-04-11