Instructions / Assembly
©2013-2016 Jewett-Cameron Company • www.jewettcameron.com • Customer Service: 800-955-2879
03-AG1-CONTRACTOR 2016-10-21
2
• Familiarize yourself with the gate hardware frames and instructions.
• Note: concave side of spreader bars faces down.
• This frame is designed to open INWARD (into your fenced area), if your application calls for an OUTWARD opening you  
 can adjust the placement of the POST HINGES to the opposite side of the post. Additional modifications may be needed   
 for outward swinging gates.
• For double drive gates openings use two gate kits. The gates will assemble the same way, just reversed. For the
 latch installation on a double-drive gate, first attach the STRIKER BAR, bring both gates together and line up the     
 LATCH CATCH with the striker bar for correct alignment to gate frame and attach. Suggested space between double
 gates is 1 inch.
• For double-drive gates drop rod kits are highly recommended (sold separately).
• As a Security precaution - Installing HINGE (E) with the top bolt facing down and the bottom bolt facing up will prevent   
 the potential theft by locking the frame into itself.
• Make sure all 4x4’s posts and 2x4’s rails are straight (bowing or crooked 4x4 & 2x4’s may make the adjust-a-gate out 
 of alignment)
• If cutting the spreader bars spray all cut ends with a Rust Oleum® type product to prevent rusting.
GETTING READY TO ASSEMBLE YOUR GATE KIT
 STEP 1: POST HINGE (E) INSTALLATION 
A) Locate the CENTER POINT (top to bottom) on your POST.
B) Measure up 10” and down 10” to find the CENTER   
 POINT for each POST HINGE BRACKET (E). 
C) Position POST HINGE BRACKETS so J-BOLTS point toward 
 the center point and the hinge plates are on the inside 
 gate swinging side of the post. Attach brackets using 2” 
 WOOD SCREWS (J) 
Note: for best results this Adjust-A-Gate is designed to open 
inward but can be modifed to open outward by placing the 
hinges on the opposite side of the post
 STEP 2: GATE HINGE (D) and FRAME (A) INSTALLATION 
A) Loosely attach the FRAME HINGES (D) to the HINGE SIDE of  
 the GATE FRAME (A) - remember that the pre-drilled hole 
 for the truss cable is located at top inside of this frame 
 piece.
 Slide the BOTTOM FRAME HINGE (D) into position onto the  
 BOTTOM POST HINGE (E), tighten bolt.
 Slide the TOP FRAME HINGE (D) into position onto the
 TOP POST HINGE (E), tighten bolt.
B) Insert the SPREADER BARS (B) into slip member on the 
 gate frame as shown. 
B
E
J
D
B
10”
10”










