Mobile, Wood Roll File with 21 Compartments ADI625 USER GUIDE
Thank you for your purchase. AdirOffice has a commitment to deliver quality and stylish office furniture and equipment. We understand starting and maintaining a business is expensive enough. We can help you make it cost effective and beautiful. Plus, our expert team makes sure everything you need works as efficiently as possible.
Table of Contents 1 Parts and Hardware 3 Assembly Instructions 11 Warranty 12 Disclaimer
Parts and Hardware Parts: 1 Left-Side Panel 4 Back Panel 7 Vertical Panel (x6) 1 2 Right-Side Panel 5 Bottom Panel 3 Front Panel 6 Horizontal Panel (x2)
Parts and Hardware Hardware: A Caster Wheel (x4) D Handle (x2) G B M3.
Assembly Instructions STEP 1 A. Lay the Bottom Panel (4) on a flat, clean surface with the 16 pre-drilled holes facing up. B. Take the 4 Caster Wheels (A) over the pre-drilled holes, insert the 16 M3.5 x 10 mm Screws (B) and tighten them using a screwdriver.
Assembly Instructions STEP 2 A. Line up the Left-Side Panel (1), the Front Panel (3), and the Back Panel (4), as pictured. B. Insert 5 M4 x 45 mm Screws (C) into the pre-drilled holes and tighten them with a screwdriver.
Assembly Instructions STEP 3 A. Slide the Bottom Panel (5) between the Left-Side Panel (1), the Front Panel (3), and the Back Panel (4).
Assembly Instructions STEP 4 A. Place the Right-Side Panel (2) over the assembled structure, as pictured. B. Insert 5, M4 x 45 mm Screws (C) into the pre-drilled holes and tighten with a screwdriver.
Assembly Instructions STEP 5 A. Take the 2 Horizontal Panels (6) and have their open slots facing up. B. Slide all 6 Vertical Panels (7) in the open spaces of the Horizontal Panels (6).
Assembly Instructions STEP 6 A. Take the 2 Handles (D) and push them into the pre-cut holes on the sides of the Left-Side Panel (1) and the Right-Side Panel (2) by applying light pressure.
Assembly Instructions STEP 7 A. Place the Screw Hole Cover’s (E) into all of the screw holes and apply light pressure.
Assembly Instructions STEP 8 G A. T ake all 2 Horizontal Edge Channel’s (F), lay them on a flat, clean surface. F B. P lace all 6 Vertical Edge Channel’s (G) on top and lightly push them into place, as pictured. C. O nce assembled, place the whole structure in-between the Left-Side Panel (A) and the Right-Side Panel (2). STEP 9 A. P lace the assembled edge channel’s on top of the built structure of the Horizontal Panels (F) and the Vertical Panels (G).
Limited Warranty 1. A dirCorp (the company) warrants to the purchaser that the product will be free from defects in workmanship and materials for a period of three (3) year from the date of purchase. 2. These warranties are not assignable or transferable to any other person. 3.
Disclaimer By purchasing products from AdirCorp, the user agrees as follows: TO THE MAXIMUM EXTENT PERMITTED BY LAW, THE PRODUCTS AND INFORMATION ON THIS SITE IS PROVIDED “AS IS” AND WITH ALL FAULTS AND ALPINE INDUSTRIES.
ADIHO201-01-BLK ADI625 27 Selvage Street • Irvington, NJ • 07111 • © 2021 AdirCorp adircorp.