Install Instructions
MagnaClean
®
Micro2 has been developed by the industry leading and
multi-award winning company that pioneered magnetic filtration. ADEY’s filters protect
over three million heating systems throughout Europe removing virtually 100% of the
damaging suspended black iron oxide sludge that builds up in all hydronic heating systems.
The dual-action filter can be installed anywhere on the main circuit. However, to
achieve the best level of protection for the boiler or baseboard, it is recommended
that MagnaClean Micro2 is fitted after the last radiator and before the boiler.
Installation
The following instructions are designed to
support engineers in the safe and effective
installation and servicing of MagnaClean
Micro2 and should be followed at
all times.
Any queries should be directed to ADEY on
844 378 0442
Open vented system Tankless/ Sealed system
In both diagrams, position A is best
practice, while B is suitable.
Note: We firmly recommend MagnaClean
Micro2 is installed and serviced by a
qualified heating engineer.
Your system is protected by
Annual service required
adeyusa.com
Servicing
3
2
1
4
2
Open drain
Close
drain
Close
vent
Open vent
Take care not to
over tighten
4 7
5 6
1
2
2
Tighten compression nuts
3 4 7 8
6
2
1
3
Open
vent
Turn
valves
ON
9
1
2
3
Open vent
Turn
valves
OFF
1 3
1
2
3
4
Clean
Clean
5
Clean
Remove cover
1
2
3
Open
vent
Turn
valves
ON
8
Ensure pin is in
locked position
Micro
Micro
ORR
3 7∕8’’
¾” iron
1
3 7∕8’’
¾” copper
1
Close
vent
Close
vent
Close
vent
Add
MC1+
Protector
Add
MC1+
Protector
Avoid
over-
tightening


