Instructions / Assembly

Figure 4
7. 小心地将浴缸放置到位
(图4)并连接排水管
硬件(预安装在浴缸上)。
完成管道的安装。
8. 将浴缸装满水
溢出然后排干浴缸,同时
检查废物连接
7. Carefully set tub into position (Figure 4)
and connect the drain hardware (prein-
stalled on the tub). Finish the installation of
the plumbing.
8. Fill the tub with water to the overflow
and then drain the tub while inspecting the
waste connections below the floor for
leaks. Access from below is recommended
for this step