User's Manual
FX500R / FX 500 / FX250 Installation cum Operation Manual
Page 19 of 43
Proprietary Information Not To Be Disclosed Without Written Authorisation From
Addvalue Innovation Pte Ltd, All Rights Reserved
The mast should provide the internal hole for the installation of the coaxial cable.
The flange (known as the top plate) of the mast shall meet the dimensions of the ADU’s
mounting base, where there are 6 holes.
The rubber gasket is required to be inserted between the ADU mounting base and the
flange
.
A : Use M6x
35
Hex Head Screw
bolts (6x) into the threaded holes
of ADU Mounting Base for
mounting the ADU.