Installation guide
Table Of Contents
- About This Guide
- Hardware Overview
- Preparing for Installation
- Rack-Mounting the System
- Installing Modules
- Cabling the System
- Powering On and Powering Off
- Configuring Network Access
- System Specifications and Compliance
- Martek Power Supply
- Wiring Diagrams
- Glossary
- Index

Cuda 12000 IP Access Switch Installation Guide
Installing System Modules 89
8. Move the ejector levers to the inward position (Figure 4-8) until you feel
them lock into place. The ejector lever hooks must catch the holes in the
chassis edge grid, as shown in Figure 4-8; this action locks the module in
place. As you move the ejectors to the inward position, you should feel
the module connectors engage the backplane connectors as the module
seats firmly in place.
9. With the module fully inserted, and the ejector levers locked in the
inward position, secure the module in place with the captive screws, as
shown in Figure 4-8.
CAUTION: Be sure not to over-tighten the screws.
Figure 4-8 Seating and Securing the Module
Repeat the above steps for any remaining system modules that you want to
install.
R
x
0
d
B
T
x
-
3
0
d
B
Power
Fault
Status Display
PORT
100 MEG
LINK
FDX
Active
1
2
3
4
5
6
7
8
R
e
a
d
M
a
n
u
a
l
b
e
f
o
re
a
c
tu
a
tin
g
b
u
tt
o
n
R
x
0
d
B
T
x
-
3
0
d
B
O
N
1
0
OFF
O
N
1
0
OFF
P
o
w
e
r
F
a
u
lt
S
ta
tu
s
D
is
p
la
y
P
o
w
e
r
F
a
u
l
t
S
ta
tu
s
D
is
p
la
y
A
c
tiv
e
L
in
k
K
e
y
b
o
a
r
d
M
o
u
s
e
C
o
m
1
C
o
m
2
1
0
/
1
0
0
E
n
e
t
P
o
w
e
r
F
a
u
lt
S
t
a
tu
s
D
is
p
la
y
A
c
tiv
e
L
in
k
K
e
y
b
o
a
r
d
M
o
u
s
e
C
o
m
1
C
o
m
2
1
0
/
1
0
0
E
n
e
t
1
2
3
4
5
6
7
8
A
c
tiv
e
F
D
X
L
in
k
1
0
0
M
B
P
o
r
t
BA
C
1
8
A
Power
Fault
Status Display
Ejector
Lever
Hook
Captive
Screw
Captive
Screw
Chassis
Edge
Grid
Chassis
Edge
Grid
Ejector
Lever
Hook
1
2