Installation guide
Table Of Contents
- About This Guide
- Hardware Overview
- Preparing for Installation
- Rack-Mounting the System
- Installing Modules
- Cabling the System
- Powering On and Powering Off
- Configuring Network Access
- System Specifications and Compliance
- Martek Power Supply
- Wiring Diagrams
- Glossary
- Index

ADC Telecommunications, Inc.
58 C
HAPTER 2: PREPARING FOR INSTALLATION
Safety Guidelines
This section provides safety information and other guidelines to help ensure
your protection and prevent damage to the system. Observe these guidelines
whenever working with the Cuda 12000.
This section does not cover every potentially hazardous condition, so please
use proper caution when working with the system.
Safety When Lifting
To help prevent bodily injury when lifting or moving the chassis or other
system components, follow these guidelines:
■ Don’t attempt to lift the chassis by yourself. Always use an appropriate
number of personnel to lift and move the chassis.
■ When lifting the chassis, ensure that your footing is solid.
■ Never move suddenly or twist your body when lifting the chassis.
■ If you must bend when lifting the chassis, bend at the knees and not your
waist.
■ Always disconnect all external cables before moving the chassis.
■ Before moving the chassis, ensure that you have an unobstructed path to
the rack.
Safety When Rack Mounting
To prevent bodily injury and ensure that the system remains physically stable
when mounting or working with the unit, follow these guidelines:
■ If this unit is the only device in the rack, mount the unit at the bottom of
the rack.
■ If the rack is partially filled, you should load the rack from the bottom to
the top mounting the heaviest unit at the bottom of the rack.
■ If stabilizers are provided with the rack, ensure that they are installed
before mounting or working with the rack-mount unit.