Installation guide
Table Of Contents
- About This Guide
- Hardware Overview
- Preparing for Installation
- Rack-Mounting the System
- Installing Modules
- Cabling the System
- Powering On and Powering Off
- Configuring Network Access
- System Specifications and Compliance
- Martek Power Supply
- Wiring Diagrams
- Glossary
- Index

ADC Telecommunications, Inc.
126 C
HAPTER 6: POWERING ON AND POWERING OFF
3. Ensure that the power source to which you have connected the chassis is
on.
4. Move the top power source (A) switch, located in the lower-right front of
the chassis, to the on position.
5. If you have connected to a second power source, move the lower power
source (B) switch, located in the lower right-front of the chassis, to the on
position.
Figure 6-1 Power On/Off Switches
Observing LED Activity
Modules have power and fault LEDs to indicate operating status. When you
power on the Cuda 12000, the LEDs on the modules illuminate as each
module begins an initialization process that includes diagnostics and the
loading of operational code, as described in “Understanding the Initialization
Process,” next.
Power
Fault
Status Display
R
ead M
anual
before
actuating
button
Power
Fault
S
ta
tu
s
D
is
p
la
y
Power
Fault
S
ta
tu
s
D
is
p
la
y
A
c
tiv
e
L
in
k
Keyboard
Mouse
Com 1
Com 2
10/100 Enet
Power
Fault
S
ta
tu
s
D
is
p
la
y
A
c
tiv
e
L
in
k
Keyboard
Mouse
Com
1
C
om 2
10/100 Enet
1
2
3
4
5
6
7
8
A
c
tiv
e
F
D
X
L
in
k
1
0
0
M
B
P
o
rt
R
x
0
d
B
T
x
-
3
0
d
B
O
N
1
0
O
F
F
O
N
1
0
O
F
F
ON
1
0
OFF
ON
1
0
OFF
BAC_28B