Cuda 12000 IP Access Switch Installation Guide
Cabling for System Fault Reporting 123
Figure 5-21 shows the cabling of the Alarms In DB-15 connector on the rear
chassis panel to the fan tray and the power source using the 3-way cable.
Figure 5-21 Cabling for Fault Reporting with 3-way Cable
Refer to Appendix C for fault reporting wiring diagrams.