Installation guide
Table Of Contents
- About This Guide
- Hardware Overview
- Preparing for Installation
- Rack-Mounting the System
- Installing Modules
- Cabling the System
- Powering On and Powering Off
- Configuring Network Access
- System Specifications and Compliance
- Martek Power Supply
- Wiring Diagrams
- Glossary
- Index

Cuda 12000 IP Access Switch Installation Guide
Connecting Power 113
Figure 5-13 Power Connectors on Chassis
5. To connect the first (A) power source, do the following:
■ Connect the return wire from the first power source to the power
terminal labelled 48 V (A) Return, as shown in Figure 5-14.
and
■ Connect the Source wire from the first power source to the power
terminal labelled –48 V (A) Feed, as shown in Figure 5-14.
and
■ If you are connecting a second power source, go to the next step. If
your are only connecting the single power source, go to step 7.
BAC_31B
J
1
1
J1
0
J
9
J8
J
7
J
6
J
5
J4
J
3
J
2
J1
Power
Studs (4)
48 V (A) Return
-48 V (A) Feed
48 V (B) Return
-48 V (B) Feed
Power Connector
Captive Cover
Screw
Captive
Thumbscrew
Nuts (4)
Lock Washers (4)