Installation guide

Table Of Contents
ADC Telecommunications, Inc.
10 C
HAPTER : ABOUT THIS GUIDE
Document Organization
The Cuda 12000 IP Access Switch Installation Guide is organized as follows:
Chapter 1: Hardware Overview — Provides a physical and functional
overview of the Cuda 12000 and system components.
Chapter 2: Preparing for Installation — Describes site requirements,
safety information and other considerations that you should be aware of
before installing the system.
Chapter 3: Rack-Mounting the System — Provides step-by-step
procedures for rack-mounting the chassis and related system
components.
Chapter 4: Installing Modules — Provides information and procedures
on how to install and replace system modules.
Chapter 5: Cabling the System — Provides step-by-step procedures for
cabling system components and power sources.
Chapter 6: Powering On and Powering Off — Provides information
on system initialization processes and includes explanations of status
messages and LED activity upon boot up.
Appendix A: Configuring Network Access — Contains information
on getting started using the Cuda 12000.
Appendix B: System Specifications and Compliance — Contains
information on Cuda 12000 hardware specifications and compliance.
Appendix C: Martek Power Supply— Contains an explanation of the
front panel LEDs for the optional Martek Power Supply and some basic
troubleshooting techniques.
Appendix D: Wiring Diagrams — Contains pin-outs for serial access
cabling and fault reporting cabling.
Appendix E: Glossary — Provides a list of terms with definitions.