User's Manual
Table Of Contents
- SECTION 6 Installing Unison Accel
- 6.1 Installation Requirements
- 6.2 Safety Precautions
- 6.3 Preparing for System Installation
- 6.4 Unison Accel Installation Procedures
- 6.5 Interfacing an Accel Hub to a Base Station or a Roof-top Antenna
- 6.6 Connecting Contact Alarms to an Accel System
- 6.7 Alarm Monitoring Connectivity Options
- SECTION 7 Replacing Unison Accel Components in an Operational System
- SECTION 8 Maintenance, Troubleshooting, and Technical Assistance
- APPENDIX A Cables and Connectors
- APPENDIX B InterReach Unison Accel Property Sheet
- APPENDIX C Compliance
- APPENDIX D Release Notes
6-4 InterReach Unison Accel Installation, Operation, and Reference Manual PN 9000-10
620021-0 Rev. A
6.3 Preparing for System Installation
6.3.1 Pre-Installation Inspection
Follow this procedure before installing Unison Accel equipment:
1. Verify the number of packages received against the packing list.
2. Check all packages for external damage; report any external damage to the ship-
ping carrier. If there is damage, a shipping agent should be present before you
unpack and inspect the contents because damage caused during transit is the
responsibility of the shipping agent.
3. Open and check each package against the packing slip. If any items are missing,
contact LGC Wireless customer service.
4. If damage is discovered at the time of installation, contact the shipping agent.