User's Manual
Installing and Using the AdminManager Software PRELIMINARY
7-22 InterReach Unison User Guide and Reference Manual
PN 8700-10
620003-0 Rev. A
7.2.4 Step 4: Final System Test
This step performs an end-to-end RF path functional test that includes cable length
estimation and system gain refinement. Any disconnect status is cleared and all fault
logs are cleared.
Figure 7-6 Step 4: Final System Test
Perform Final System Test
1. Click the APPLY button if the configuration is displayed correctly in the System
Status pane.
For a fully loaded system (one Main Hub, four Expansion Hubs, and 32 RAUs), it
can take 1.5 minutes to complete the test.
2. Click the NEXT button when a successful test message is displayed in the Mes-
sages pane.
You can use the
BACK button to return to previous steps and make changes if an error
is displayed in the Messages pane.