User's Manual
7-18 InterReach Unison Installation, Operation, and Reference Manual PN 8700-10
620003-0 Rev. B
7.4.1.2 Installing Main Hubs in a Multiple Operator System
Installing Main Hubs in a multiple operator system is the same as described in
Section 7.4.1 on page 7-12.
We recommend mounting all multiple operator system Main Hubs in the same
rack(s), grouped by frequency or wireless carrier. For example, group the Main Hubs
for the 800 MHz cellular bands together, and so on.
Connecting to base stations and repeaters is the same as described in Section 7.6 on
page 7-33 and Section 7.6.1 on page 7-37.