User's Manual

7-14 InterReach Unison Installation, Operation, and Reference Manual PN 8700-10
620003-0 Rev. B
Programming a Frequency Band into the Main Hub
To program a band into the Unison Main Hub:
1. Start AdminManager.
2. Select the Installation Wizard (Local) radio button and click RUN.
The Step 1, Verify Hardware window is displayed. The Main Hub will be the only
device listed.
3. Click NEXT.
The Step 2, Set Operation Band window is displayed.
4. Select the desired frequency band from the pull-down list and click APPLY.
A message is displayed indicating that the system test was not performed and to
check the Expansion Hub(s) and RAU(s) for faults.
The Power LED should be steady green.
The Main Hub Status LED should be steady green.
All fiber port LEDs should be off, indicating that no fiber cables are connected.
5. Click NEXT.
The Step 3, Configure System Parameters window is displayed.
6. Leave the default settings and click NEXT.
The Step 4, Final System Test window is displayed.
7. Click APPLY.
A message is displayed indicating the system test was not performed because
there are no Expansion Hubs or RAUs connected.
8. Click NEXT.
The Finish window is displayed.
9. Click FINISH.
The AdminManager session ends and the window closes.
NOTE: Refer to Section 9 for troubleshooting.