User's Manual

ADCP-75-348 • Issue 1 • 04/2008
Page 14
© 2008, ADC Telecommunications, Inc.
Use the following procedure to install the HU in the equipment rack:
1. The HU is shipped with the mounting brackets installed for 19-inch rack installations. If
mounting the HU in a 19-inch rack, proceed to
Step 4. If mounting the HU in a 23-inch
rack, proceed to Step 2.
2. Remove both mounting brackets from the HU (requires TORX screwdriver with T20 bit)
and save screws (six-screws on each side) for reuse.
3. Reinstall both mounting brackets so the short side of the bracket is flush with the HU front
panel as shown in
Figure 10. Use the screws removed in Step 2 to re-attach the brackets to
the HU chassis.
Figure 10. Installing the Mounting Brackets for 23-Inch Rack Installations
4. Position the HU in the designated mounting space in the rack (per system design plan) and
then secure (but do not tighten) the HU to the rack using the four machine screws provided
(use #12-24 or M6 x 10 screws, whichever is appropriate).
5. Locate two vertical cable guides, not provided with the HU.
Warning: Wet conditions increase the potential for receiving an electrical shock when
installing or using electrically powered equipment. To prevent electrical shock, never install or
use electrical equipment in a wet location or during a lightning storm.
Note: To insure that all optical connectors remain dust-free during installation, leave all dust
caps and dust protectors in place until directed to remove them for connection.
Note: Provide a minimum of 3 inches (76 mm) of clearance space on both the left and
right sides of the HU for air intake and exhaust.
Note: A vertical cable guide kit is available separately as an accessory.
INSTALL MOUNTING
BRACKETS AS SHOWN FOR
INSTALLATION IN 23-INCH RACKS
22394-A