User's Manual
ADCP-75-348 • Issue 1 • 04/2008
Page 11
© 2008, ADC Telecommunications, Inc.
6.3 OSP Fiber Cable Installation Guidelines
The outside plant (OSP) fiber optic cables should be routed between the HU distribution panel
and RU outside plant cabinet and terminated before the equipment is installed. A diagram of a
typical OSP cable routing is shown in
Figure 7. At the HU, the OSP cable should be terminated
at a fiber distribution panel and spliced to pigtails. Jumper patch cords may then be used to link
the HU optical ports to the OSP cable terminations. Whenever possible, a guideway such as the
FiberGuide system should be provided to protect the fiber optic patch cords from damage and to
prevent excessive bending. The procedures for connecting the OSP cable optical fibers to the
HU is provided in
Section 6.8.
Figure 7. Typical Fiber Optic Cable Routing
HOST UNIT
FIBER DISTRIBUTION
PANEL
OUTDOOR
REMOTE SITE
HOST SITE
PATCH
CORDS
SPLICE
INDOOR/OUTDOOR
QUAD CABLE WITH
PRE-TERMINATED
CONNECTOR
OUTSIDE PLANT
CABLE
URH
REMOTE
UNIT
22383-A
INDOOR
REMOTE SITE
X
TERMINATION
X
URH
REMOTE
UNIT
OUTSIDE PLANT
CABINET
X