User's Manual
Table Of Contents
- Install the RF Module(s)
- Safety Precautions
- Guard against Damage from Electro-Static Discharge
- Unpack and Inspect the RF Module
- Remove Release Liners from the RF Module
- Check the DC Power Switch for the Module Bay
- Dual-Bay Modules Only—Remove the Module Bay Shelf
- Install the RF Module into the Prism Remote Chassis
- Secure RF Module Latches
- Connect the RF Module Cables to the PRU Chassis
- Power on the RF Module(s) and the Prism Remote Unit
- Close the Remote Unit Door and Solar Shield
- Provision the Prism Remote Unit
- FlexWave Notch Filter (FWP-SPRINTFILTER)
- Fan Module Maintenance
- Specifications
- Standards Certification
- DCCS Global Technical Support
- DCCS Technical Training
- Accessing FlexWave User Documentation
FlexWave
®
Prism Remote Unit and RF Module Installation Guide FWPP-504-02
Page 94 © May 2017 CommScope, Inc.
Install the RF Module(s)
3 AligntheMountingHookonthemodulewiththereceivingflangeonthePRUheatsink,andthenslidetheRF
Moduleintowardtheflangeuntilitcangonofurther.
4 PushtheleftedgeoftheRFModulebackandintothePRUchassisuntilitcangonofurther,asshowninthe
followinggraphics:
• ForSingle-BayRFModules,seeFigure25onpage95.
• ForHDMRFModules,seeFigure26onpage96.
• ForDual-BayRFModules,seeFigure27onpage97,whichusestheLegacyDual-Bay40WRFModuleas
anexample.
CAUTION! Make sure the RF Module is seated correctly in the Module shelf. Incorrect alignment of the RF Module
can cause the RF Module to fail due to overheating.
• The front edge of the RF Module should be parallel with the shelf above it.
• The Mounting Hook on the RF Module should be fully engaged with the Receiving flange on the
Remote Unit chassis.
• An incorrectly seated RF Module makes closing the Prism door difficult. If you later cannot shut the
Remote Unit door, verify that the RF Module is installed correctly.
RF Module
Mounng
hook
Chassis
Receiving
flange
Mounng Bracket at
back of the PRU
(View is looking down into the
PRU chassis from the top.)