User's Manual
Table Of Contents
- Install the Prism Remote Unit
- Planning for a Prism Remote Unit Installation
- Unpack and Inspect the Prism Remote Unit and Components
- Mount the Prism Remote Unit
- Ground the PRU Chassis
- Connect a Network Cable to the PRU Chassis
- Connect Fiber Cable to the PRU Chassis
- Connect the Antenna Cable
- Determine the Circuit Breaker or Fuse for the PRU
- Connect the Power Wiring
- (Optional) Connect the Prism Remote Unit to a UPS
Install the Prism Remote Unit
FWPP-504-02 FlexWave
®
Prism Remote Unit and RF Module Installation Guide
© May 2017 CommScope, Inc. Page 35
Figure 12. Mounting Dimensions for Quad-Bay PRUs
41.7” (105.918 cm)
Band 1 to Boom Band
28.0” (71.12 cm)
Top Bolt to Boom Bolt
27.6” (70.104 cm)
Band 2 to Boom Band
11.1” (28.194 cm)
Band 3 to Boom Band