User's Manual
Table Of Contents
- Install the Prism Remote Unit
- Planning for a Prism Remote Unit Installation
- Unpack and Inspect the Prism Remote Unit and Components
- Mount the Prism Remote Unit
- Ground the PRU Chassis
- Connect a Network Cable to the PRU Chassis
- Connect Fiber Cable to the PRU Chassis
- Connect the Antenna Cable
- Determine the Circuit Breaker or Fuse for the PRU
- Connect the Power Wiring
- (Optional) Connect the Prism Remote Unit to a UPS
Install the Prism Remote Unit
FWPP-504-02 FlexWave
®
Prism Remote Unit and RF Module Installation Guide
© May 2017 CommScope, Inc. Page 43
Steel Pole Installation Using Steel Banding
CAUTION! Always wear safety goggles when working with metal banding and when using tensioning tools.
CAUTION! This section describes how to secure a PRU to a steel pole using steel bands. In high earthquake risk
areas, CommScope advises in addition to banding, bolts should be used redundantly to ensure
mechanical mounting capable of surviving severe seismic activity. Typical areas where this attachment
method are suggested are Earthquake Risk Zone 4, per Bellcore GR-63-CORE, section 4.4.1.1. If you have
application specific questions, consult the Wireless Technical Assistance Center (TAC) for technical
assistance (see "DCCS Global Technical Support” on page 124). For information on bolting, see "Pole
Mount Installation Using Bolts” on page 46.
Stainless-steelbandsareusedto
securetheMountingBrackettoametalpoleormastthatcannotbepiercedwith
ascreworbolt.ThenumberofbandstobeusedisdependentontheconfigurationofthePRUasdescribedin
Table20onpage36.
1 Referto"MountingCautions”onpage42
beforebeginningthisprocess.
2 Locate
theMountingBracketprovidedwith
thePRUMountingKitandobtainthetools
andsupplieslistedin"ToolsRequiredforAll
MountingMethods”onpage36and
"AdditionalToolsandSuppliesRequiredfor
Steel-PoleMounting”onpage36.
CAUTION! The pole must have a
diameter of at least
6 inches.