User's Manual

Page32 FlexWavePrismRemoteUnitRFModuleInstallationGuide
©2014 TEConnectivityLtd. TECP77141Issue6 300001744178RevF April2014
LatchesonLegacyDualBay40WRFModules
ForLegacyDual‐Bay40WRFModules,securefourlatches,asshowninFigure20.
Four latches in a
Legacy Dual-Slot 40W
RF Module
Figure20.LegacyDualBay40WRFModuleLatches
VerifythattheRFModuleMountingHookisEngaged
1 VerifythattheRFModuleMountingHookisengagedcorrectlybypullingthemoduleawayfromtheheatsink.
TheRFModuleshouldnotmove.IftheRFModulemovesduringthischeck,repeatallthestepsstartingat
“InstalltheRFModuleintothePrismRemoteChassis”onpage22throughthisstep.
ConnecttheRFModuleCables
ThestepstoconnecttheRFModulecableshavebeenseparatedintotwodifferentprocedures;followthesteps
thatcorrespondtotheRFModulebeinginstalled.
“ConnectingCablesinaSingle‐BayRF
ModuleInstallation”onpage33
“Conn
ectingCablesinaDual‐BayRFModuleInstallation”onpage35.