User's Manual
Table Of Contents
- Document Overview
- Overview of RF Modules for Prism Remote Units
- RF Module Components
- RF Group Assignments for PRU RF Module Bays
- Understanding RF Cable Rules
- Install the RF Module(s)
- Safety Precautions
- Guard against Damage from Electro-Static Discharge
- Unpack and Inspect the RF Module
- Remove Release Liners from the RF Module
- Check the DC Power Switch for the Module Bay
- Dual-Bay Modules Only—Remove the Module Bay Shelf
- Install the RF Module into the Prism Remote Chassis
- Secure RF Module Latches
- Connect the RF Module Cables to the PRU Chassis
- Power on the RF Module(s) and the Prism Remote Unit
- Close the Remote Unit Door and Solar Shield
- Provision the Prism Remote Unit
- FlexWave Notch Filter (FWP-SPRINTFILTER)
- Standards Certification
- Accessing User Documentation on the TE Customer Portal
- Contacting TE Connectivity
FlexWave Prism Remote Unit RF Module Installation Guide Page 35
TECP-77-141 Issue 8 • 300001744178 Rev H • August 2015 ©2015 TE Connectivity
Connect Latches on Dual-Bay RF Modules
For Dual-Bay RF Modules, secure four latches, as shown in Figure 19.
Four latches in a
Dual-Band Dual-Slot
RF Module
Figure 19. Dual-Bay RF Module Latches