Installation Guide

Install the RF Module(s)
Page 40 FlexWave Prism RF Modules for Prism Remote Units Installation Guide
© 2013 TE Connectivity Ltd TECP-77-141 Issue 5 300001744178 Rev E November 2013
Figure22.Cable Connections for HDM RF Modules
ConnectingCablesinaDualSlotRFModuleInstallation
1 PositionthecablessothattheyareundertherightedgeoftheRFModule,pointingup.
2 Followtheruleslistedin“UnderstandingtheRFModuleCables”onpage15.
3 FollowtheruleslistedbelowthatpertainonlytoDual‐SlotRFModules.
TheupperRFModuleshelfwilleithernotbepresent(factoryinstalledmodule)orwillbe
removedpriortoinstallation(fieldinstalledmodule).
TheMODNTX0/RX0cableforthelowerRFModuleslotwillneedtobeconnectedtothe
MODNTX0/RX0N‐StyleRFconnectionoftheDual‐SlotRFModule.
ConstraintheMODNTX1/RX1cabletotheexistingcablesusingatiewrapsuchsoit
cannotbepinchedorpreventthePRUdoorfromclosing.Donotcutorattemptto
otherwiseremovethisRFcable.
ThePower(PWR)cableandtwoLVDScablesoftheupperRFModuleslotarenotused
wheninstallingaDual‐SlotRFModule.
Cable Connections for an HDM RF Module
TX0/RX0
TX1/RX1
POWER
DATA 1 (DIV)
DATA 0 (PRIM)
Cable Connection Notes
• Always connect the Power cable.
• Always connect the two LVDS cables: PRIM and DIV.
• SISO requires one RF cable (TX1/RX1).
• MIMO and Dual-Band require two RF cables
(TX1/RX1 and TX0/RX0).