User's Manual

System Management
FlexWave Prism Element Management System 7.1 User Manual Page 131
ADCP-77-177 Issue 1July 2011 © 2011 ADC Telecommunications, Inc.
PERFORM SYSTEM TEST
System Test performs an RF integrity check of the system. Certain alarms (such
as the RAU Antenna Disconnect alarm) can only be set or cleared by running System
Test.
CAUTION! Running System Test (System Configuration > Perform System Test) with un-terminated Host
DARTs may cause a false RLM Upconvert Fault. Ensure that all Host DARTs are terminated before
running System Test.
CAUTION! System Test interrupts RF transmission; System Test should therefore only be run during a normal
maintenance window.
CAUTION! Do not make any software or hardware configuration changes during System Test, as changes
made during the test will make the test results unreliable.
1 In the System Menu bar, click System Configuration > Perform System Test.
NOTE: The table at the bottom of the Perform System Test page presents the results of the last
System Test, if any, as shown above.