User Manual Part 1
Installing the Host Unit
Page 90 FlexWave Prism Host, Remote and EMS 5.1 System Reference
© 2009 ADC Telecommunications, Inc ADCP-77-073 • Issue 2 • 11/2009
When multiple Hosts require connection to a WDM system, the Host module
mounting shelf and the Hosts should be mounted in the equipment rack as shown in
Figure 3-8. This configuration allows the fiber patch cord leads from the two Host
modules to be connected directly to the optical ports on any one of the four Hosts.
Figure 3-8. Typical WDM and Host Configuration
3.4.2 Install WDM Host Components
The WDM Host module mounting shelf may be mounted in either a 19-inch or 23-inch
EIA or WECO equipment rack. Four #12-24 screws are provided for securing the
mounting shelf to the rack.
Use the following procedure to install the WDM Host module mounting shelf in the
equipment rack and to mount the WDM modules in the WDM Host module mounting
shelf.
WDM MOUNTING
SHELF
(WITHOUT MODULES)
22392-A
POWERWORX
FUSE PANEL
HOST UNITS
HOST SLACK FIBER STORAGE