EDT ensue BRR Chaplin 3 Oil ne Domes lining Rifling 33 Sed fa Hau Printing EE: Sled OR boomed ie para 680 Hs oe yon filbert ses mpm, Pride REE Ri pair a ha ol, Tis ia Have the Her Trail Anion, oe Be Ena RR RE CHE RC pal eyed [H $24 POWER-ON LED TESTS PEAT OE RE NEON BTR BAT DONS CURRANT pro Hes leis windy aE BEDE SiS PEE nae NB oli [SER BITS TTI ETE FOL SH GETS TROT), NEE OI IB ETE HRA RIE BENET SRE EN RH SET SRR INE EEN ini Brunei Pillowing.
ABP TTT * issue T+ DEAN Logier Sn 1 Turn ihe power ly s wp kad across the the chassis on by simultaneously switching on bwo power supplies, The show are shown in Fig 0. This will share the star prows sl cower supplier.
ALTAI x Tha Sd hank Serf BRE RR Ed we: Sad ire rr Foi Wok ale tea Se ey Gia Fon Bon Sid sik Ts FG EE BONE DRY he BPR iA Mir STS: noi ans Semis nl fie:
ABETTOR = issue 1 + PRAISE » Haggler $n (HE 3.5 POST OFF-LINE COMMISSIONING The following post off-line commissioning procedures ary pessimism 16 ensure that the Micro BE fe moody for on-hoe commissioning. In the wae of off-line commissioning »t ares, these procedures ev the Micro BTS w ready Bor allocations, In the vase of offline commies sr on-site stagflation, these procedures ensue that the Micro B is ready For on-line commissioning. 3.
1 + SINE + Chapter 4» OF 4.
ABETTOR = issue T+ DRANO » Cagier 5 in 5.2.2 5.2.3 5.2.
ABETTOR = issue T+ DRANO » Cagier 5 in Table 8-2: Smoothness Needing Testing In BTS with Mrs Than One THY HAHN THERETO Chanel Te STD NECESSARY First TRX (Note & BCH His i BOOHOO His 2 TH Yes # TH Yes 4 TH Yes 5 TOR Yas & TOR Yen 2 TH Wes Someone Pronghorn Sigh TRE (ot) ° TH 1 Yes ¥ Yes 3 Yes 4 You 5 You & You 1 Teh Yo Mote: The OCH ax THX chow i “Hurst” or be ale to uny TRY within fhe 3700 Tubeless "Hi ned the BOO, The OMC parser m ¢ which ph 1 TOH limestone an the second Through Model be Bag £47 RATE Filo
Table 5-4: Allowable Post Meter Rending Range (walls) ae pam name nam sm bem 1am ey -. = Maxim 59 £7 Ag R12 Be Wan Vision test the ref Watt or 3 Ws Hot on Ii the os he preview conch gh ers essay (0 dis age he few he Foi the 3 Wherever Mites BTS validations ans Manumission inning Gui acceptably crow potting toward the ct the meter or ten off fhe Mics BTS power.
SR IF the hundredths peccadillo power is money than 49% of the forward power, B indicates power installation of the an oor a bad feeder cable. Co mat the responsible party Tor the antes axl fading vale installation 0 have the problem fixed 5.
ABP TTT * issue T+ DEAN Chapter online Blew: Bag 128 RATE Filo BTS Installation med Processioning ide © 2008, ATE T o