User's Manual
Application Note 16 – version 1.1
page 12
p
plication Note
A
Define the TurboMAX beacon TRX, and assigning ARFCN for each TRX.
When the TurboMAX is daisy chained, setting the ‘E1 use type’, ‘Previous TurboMAX node’, and
‘Next TurboMAX node’ in the TurboMAX Manager View, and setting the ‘E1 Chan’ as the Abis
channel in the Abis Manager View as described in the WAVEView OMC Operations and
Maintenance Guide.
The rest of the TurboMAX on-line commissioning requires that an on-site field engineer work with the
OMC operator as shown in Figure 6.
BSS
Unlock the Abis
interface
Unlock the
TurboMAX
Check state of
TurboMAX
Step 54
Use mobile to
verify timeslots
Unlock the
TurboMAX and
RCARRIER
Open TurboMAX
alarm and event
list views
Check state of
TurboMAX
OMC
Step 47
Turn
TurboMAX
power OFF
Step 48
Turn TurboMAX
power ON
Check alarm and
event detailed
views
Check for
cleared events
and alarm in all
views
Check for
TurboMAX state
Verify TRX
timeslots
Lock the
TurboMAX
Check state of
TurboMAX
Step 51
Disconnect E1
or T1 cables
Step 52
Reconnect E1
or T1 cables
Procedures for TurboMAX
Field Engineer
Procedures for OMC Operator
Verify Database
Step 46
Provide
TurboMAX
information
Verify external
alarms
Step 53
Test external
alarms
IW249002
Lock E1 or T1
Ports
Figure 6. On-Line Commissioning Procedures