TurboMAX in the daisy chain, Abis timeslot = 18. Fourth TurboMAX in the daisy chain, Abis
timeslot = 19.
Verify that the Abis timeslot has been changed correctly. Enter getFlashE1Chan at the bts:A->
prompt. The TurboMAX displays the timeslot reserved for the LAPD signaling timeslot.
34) Reboot each TurboMAX by entering reboot at the bts:A-> prompt.
35) After all TurboMAXs in a daisy chain have been assigned unique Abis LAPD links, connect them to
each other and to the associated BSC, BS Plus, or NIB with E1 or T1 links as described in Section
3.4.
3.8 Shutting Down the Craft PC and Disconnecting the Serial and
Ethernet Connections
36) Terminate the serial connection with the TurboMAX by entering ~. (tilde .), which returns the
prompt to build@craftpc:~>.
37) Exit the XWindows session by pressing [CTRL][ALT] and [BACKSPACE] simultaneously. At the
build@craftpc:~>”’ prompt, enter exit.
38) At the craftpc login: prompt enter root to display the craftpc:~# prompt.
39) Shut down the Craft PC operating system by entering shutdown h now. After about one minute,
the Craft PC displays System halted and INIT: No more processes left in runlevel 0.
40) Turn off the Craft PC by toggling the power switch. The serial and ethernet connections can now be
removed between the Craft PC and the TurboMAX.
41) Inform the OMC operator that the TurboMAX is ready for on-line commissioning.
3.9 On-Line Commissioning
On-line commissioning of the TurboMAX requires that an on-site field engineer work with the OMC
operator, after installation and off-line commissioning.
42) Verify that the TurboMAX is fully commissioned, that it is connected to a BSC, BS Plus, or NIB
network element, and that the OMC is communicating with the connected network element.
43) Have the operator verify that the RF frequencies are cleared to transmit.
44) Have the OMC operator download the TurboMAX configuring and correct software version and
operational parameters as defined in the WAVEView OMC Operations and Maintenance Guide and
the interWAVE Network Implemetation Manual.
45) Have the OMC operator perform the following:
Create a planned cell in the OMC database corresponding to this TurboMAX. The planned cell
should at minimum include the Cell ID and LAC for the TurboMAX.
Define neighbor relationships for the planned cell.
Create a managed cell from the planned cell.
Set the TurboMAX parameters, including its base station identity code.
Set the TurboMAX Abis parameters, including the corresponding E1 or T1 card slot and Abis