Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3, Revision A 1/99
74 WAVEXpress/BTS Installation and Commissioning Guide
Running POST Diagnostics
T1 Diagnostics
Step 1
Disconnect any T1 lines from the BTS. This ensures that no Abis connection exists. If an Abis connec-
tion did exist, the TRX POST may not run properly.
Step 2
At the
bts
:A-> prompt, type:
bts
:A->
nfsMountAll “craftpc”
Step 3
In an XTerm window, type: reboot
Step 4
This action reboots the BTS. The VxWorks kernel is started, and the 7 T1 tests run sequentially and the
results of each test will be listed as PASSED/FAILED. Only if all 7 tests passed successfully will the T1
POST diagnostics be considered successful. The E1 POST results will be displayed after the boot pro-
cess has been completed:
Step 5
The above display shows the T1 POST results that would appear if the T1 POST diagnostics ran suc-
cessfully on the T1 card in slot 1. The format for each diagnostic line is:
[line number][action][T1 number][test number][test description][test result]
In the case of an error, a FAILED message would appear following the test that failed. In addition, the fol-
lowing message will be displayed in line 10:
T1 CARD in SLOT 1: COMPLETED POST/OFFLINE Test: FAILED
Figure 4-6:
T1 POST results
NOTE
☛
If a particular T1 card fails the POST diagnostics, remove the failed card and return it
to interWAVE Communications, Inc. along with its test results file. The defective mod-
ule needs to be replaced by a new one, and POST diagnostics should be run again
on the new card.
bts:A-> 0 (defunct) INTERWAVE PROCESSOR CARD (IWP) INITIALIZED
1(defunct) STARTING BTS CODE (version: iw03_00.000)...
2(e1diag) E1 CARD in SLOT 1:STARTING POST/OFFLINE Test
3(e1diag) E1(1)TID01: Init Peripheral Registers : PASSED
4(e1diag) E1(1)TID02: Peripheral Register test : PASSED
5(e1diag) E1(1)TID03: Framer Register Test : PASSED
6(e1diag) E1(1)TID04: VME to CPU FIFO Flag Test : PASSED
7(e1diag) E1(1)TID05: Initialize Time/Space sw chip : PASSED
8(e1diag) E1(1)TID06: Software Download Test : PASSED
9(e1diag) E1(1)TID07: Memory Test : PASSED
10(e1diag) E1 CARD in SLOT 1 : COMPLETED POST/OFFLINE Test : PASSED
11(E1Mgrboot) E1 LAPD IS OPERATIONAL
12(E1Mgrboot) E1 LAPD IS ATTEMPTING TO ESTABLISH ABIS CONNECTION
WITH BSC.