Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3, Revision A 1/99
48 WAVEXpress/BTS Installation and Commissioning Guide
Required Tools
• A full set of Phillips screwdrivers
• A full set of metric and imperial lug wrenches
Note on The Outdoor Enclosure
The enclosure should have the following components assembled:
• The UPS plate, and power strip should be installed inside the base of the enclosure.
• The sun shield and heat exchanger should be mounted on top of the heat exchanger.
• The power and UPS cables should be routed.
• The swing frame should be installed in the enclosure.
• The optional filter and combiner assembly should be mounted on the swing frame.
• The cables connecting the filters and combiners should be routed.
• The supporting L-bracket should be mounted to the swing frame.
If this is not the case, contact interWAVE Communications for instructions.
NOTE
☛
The following components must be specified as separate line items while
ordering this option:
• Outdoor enclosure. Part number: M640052
• UPS kit 230V. Part number: M640045
• RF filter kit. Part number: M640053
• Heat exchanger 230V. Part number: M640042
• 2 TRX cable kit. Part number: M640062
• 3 TRX cable kit. Part number: M640063