46 WAVEXpress/BTS Installation and Commissioning Guide
3-4.9 Post Installation Checks
BTS Connection
Prior to commissioning the WAVEXpress/BTS, make sure that:
The Abis interface T1 cables are routed to the T1 provider.
Ensure that the T1 dual port is properly set for DSX cable length.
The BTS' power is turned off.
BTS-BSC Link Verification
It is the operator's responsibility to verify that all BTS-BSC T1 links are ordered, installed and cer-
tified by the T1 provider according to ITU G.703 specifications before on-line commissioning is
performed.
The operator should also perform end-to-end bit error rate tests over a 20 minute period on the
T1 Abis interface link.