Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3, Revision A 1/99
4 WAVEXpress/BTS Installation and Commissioning Guide
The chassis of the WAVEXpress/BTS can accept up to 9 cards. Card slots are labeled from left to right, starting at 0.
The IWP card must always be placed in slot 0 while the RF Dist card must always be placed in slot 8. It is usual to place
the T1 card in slot 1, and the TRX cards, each occupying 2 slots, in slots numbered 2-7. The left side of the TRX card
must be placed in an even-numbered slot; either in slots numbered 2,4 or 6. TRX cards are placed from right to left. If
the BTS is a 1 TRX BTS, the TRX is placed in slot 6-7. A second TRX is placed in slot 4-5 and a third TRX is placed in
slot 2-3.
Figure 1-3:
WAVEXpress chassis (front view, door open containing one power supply and one clock
module)
TEST RF DIST
Slot
Numbers
ON
1
OFF
0
012345678
IW265802