Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3, Revision A 1/99
xvi WAVEXpress/BTS Installation and Commissioning Guide
Craft PC Guide
Scope
This guide describes the procedures for using the Craft PC for software installation and maintenance of the
WAVEXchange, WAVEXpress and MicroXpress.
Audience
This guide is intended for on-site technicians responsible for the commissioning and maintenance of these network
elements.
interWAVE’s Network Implementation Guide
Scope
This guide is a tool to lead technicians through the processes of implementing and integrating an interWAVE
network. It defines all activities of the implementation and integration phases and clearly separates the site surveys,
installations, commissioning, and integration activities. The final goal is a micro-cellular network ready for
commercial use in a GSM or DCS network.
Audience
This guide is intended for network designers and planners who are tasked with implementation of a network. It is
also used by the WAVEView user and maintenance technician who may be interested in understanding the global
picture of a network deployment.
WAVEView Operations and Maintenance Guide
Scope
This guide describes how to use WAVEView: interWAVE’s graphical user interface (GUI) based network
management system (NMS) to manage the interWAVE product line. The first chapter contains an introduction and
a brief overview of WAVEView. Subsequent chapters contain details on the WAVEView conventions and step-by-
step instructions on how to use it in managing a network.
Audience
This guide is intended for the following types of users:
• The general operator who will have access privileges to control or monitor the whole or only
parts of the network.
• The network planner or designer tasked with the implementation of a network who will use
this guide as a reference.
• The WAVEView administrator who will have access to all parts of the NMS.