Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3, Revision A 1/99
Commissioning Checklist 135
3 __
Database questionnaire completed with BTS parameters defined
4 __
OMC downloaded BTS configuration with correct operational parameters
5 __
RF frequencies cleared to transmit
6 __
BTS T1 module’s cables connected to the local T1 Provider demarcation
7 __
BSC T1 module’s cables connected to the local T1 Provider demarcation assigned to the BTS
Note: Operator’s responsibility to verify all E1 links properly installed and certified by local T1 Provider
facilities. Certification must rate: Length of testing and BER results
BTS-BSC Network Integration
1 __
Unlock the Abis interface
2 __
Unlock the BTS
3 __
Verify the BTS’ operational state
Recovery
1 __
Perform a BTS cold start and verify that the BTS fully recovers
2 __
Confirm Abis interface re-establishes communications to BSC after T1 disconnects
Operational tests
1 __
Unlock TRX
2 __
Perform test calls on each timeslot
3 __
Perform test calls on each TRX
Final commissioning, on-line tests
1 __
Leave power to BTS on
2 __
Inform the OMC operator that commissioning is complete