Installation Manual

Table Of Contents
Release 3.3, Revision A 1/99
BTS Field Maintenance 117
Step 5
Using a Phillips screwdriver, unscrew the two screws located at the top and bottom of the RF distribu-
tion card.
Step 6
Remove the RF distribution card by firmly pulling the two white tabs located at the top and bottom of
the RF distribution card.
Step 7
Place the new RF distribution card into the slot (refer to Figure A3-1) and slide in the card until it com-
pletely rests inside the slot. Push the card firmly into place.
Step 8
Using a Phillips screwdriver, screw in the two removed screws onto the RF distribution card.
Figure A2-4:
RF distribution card semi-rigid cables layout (all RF semi-rigid cables are shown above)
TX
6.7
2,3
4,5
6,7
2,3
4,5
-1-
RX
RX
RX
TX
TX
CLK
PWR
ON
LINE
FLT
RX
TX
TEST RF DIST
-3-
-2-
PWR
ON
LINE
FLT
RX
TX
5[#7/8
7[#7/8
6HFRQG#DQWHQQD#FDEOH
050
&ORFN#FDEOH
5[#9/:
040
7[#9/:
5)#'LVW0
75;#FDEOHV
)LUVW#DQWHQQD#FDEOH
5)#'LVWULEXWLRQ#FDUG
75;#FDUGV
PWR
ON
LINE
FLT
RX
TX
5[#5/6
7[#5/6
060
7KLUG#DQWHQQD#FDEOH