Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3 Revision A 1/99
92 WAVEXpress/BTS Installation and Commissioning Guide
7-2 On-Line Commissioning
The network integration procedures listed below must be performed at the OMC to complete the BTS integration. Refer
to the WAVEView Operation and Maintenance Guide
for detailed procedures. This section contains the procedures for
on-line commissioning of the WAVEXpress/BTS.
In order to complete the on-line commissioning of the WAVEXpress/BTS successfully, a BSS field technician needs to
be on-site at the BTS and an OMC operator needs to be at the OMC in order to carry out the necessary procedures.
The BSS field technician must have all relevant information found in Checklist #1 of the Appendix ready for verification
by the OMC operator. The following flowchart contains the sequential procedures that are required to complete the
on-line commissioning. Step numbers contained in the boxes are elaborated in the corresponding steps following the
flowchart.
NOTE
☛
Before starting any of the following procedures, the BSS maintenance technician
needs to ensure that anti-static precautions are taken.