Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3 Revision A 1/99
On-Line Commissioning 91
7-1.2 Prerequisites for Network Integration
In order to integrate the BTS in a pre-existing network, several procedures must be followed at the OMC. These
procedures include:
• Creating a planned cell in the OMC's database that corresponds to the BTS physically installed.
This planned cell must be identified by the appropriate Cell ID and Location Area Code (LAC) for
the installed BTS. Optional information about which templates apply to the installed BTS can also
be defined at this stage.
• Defining neighbor relationships for this planned cell.
• Creating a managed cell from the planned cell.
• Setting BTS parameters which include defining its base station identity code.
• Setting Abis parameters. This involves defining which BSC's T1 card and slot number is con-
nected to which BTS and defining which T1 channel of the T1 link is dedicated to signaling (The
default timelsot is 16).
• Defining which TRX of the BTS is the beacon TRX and assigning ARFCN for each TRX.
• In the case of a daisy chained BTS, setting the “T1 use type”, “previous BTS node”, “next BTS
node” in the BTS Manager view, and the “T1 Chan” as the Abis channel in the Abis Manager
view as described in the chapter “Configuring Network Elements” of the WAVEView Operations
and Maintenance Guide.
Procedures on how to perform these tasks are outlined in the section “Network Configuration” of the WAVEView
Operations and Maintenance Guide.