Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Preface
Release 3.3, Revision A 1/99
xi
Assumptions, Purpose, and Audience
interWAVE assumes that pre-installation project planning has occurred, and is documented via a site survey report.
This site survey should include items such as the location of antennas, chassis, power connections and other
interface accesses and temperature control equipment.
This document is intended for an interWAVE trained field service engineer (FSE) or operator who performs local
installation and commissioning at the customer’s site. The FSE or operator should be equipped with the necessary
tools for installation and commissioning, and a basic understanding of the GSM cellular network. The FSE or Operator
should also be familiar with the use of Craft PC and procedures conducted using the Craft PC.
Related Documentation
While this guide focuses mainly on how to operate the WAVEXpress/BTS, it may be necessary to refer to other
publications for more specific information.
Documents and Part Numbers
The following is a list of all related documentation. All manuals are bundled on a single documentation CD-ROM. Print
versions of individual manuals are also available. To order documentation, please contact interWAVE Communications,
Inc. at +1.650.482.2100.
Document Title Part Number
Documentation, CD-ROM Version, Release 3.3 D640233CD