Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Post Off-Line Commissioning 85
Release 3.3, Revision A 1/99
Six
Post Off-Line Commissioning
6-1 Post Off-Line Commissioning
The following post off-line commissioning procedures need to be followed. In the case of off-line commissioning at a
staging area, these procedures ensure that the WAVEXpress/BTS is ready for installation. In the case of off-line
commissioning after installation, these procedures ensure that the WAVEXpress/BTS is ready for on-line
commissioning.
6-1.1 Post Off-Line Commissioning Procedures at the Staging Area
Step 1
Repack the WAVEXpress/BTS in its original shipping containers and make sure that it is shipped to the
site where the BTS will be installed.
Step 2
Once the BTS is installed, as described in the first section of the Guide:
• Connect the dual port T1 module cables to the T1 provider
• Power the BTS on. Verify that all PWR and On-Line LEDs are green.
• Leave the power to the BTS on
• Inform the OMC operator that the BTS is ready for on-line commissioning tests.
6-1.2 Post Off-Line Commissioning Procedures On-Site
Step 1
Reconnect the T1 cables to the digital distribution frame.
Step 2
Power the BTS on if it is not already on. Verify that all PWR and On-Line LEDs are green.
Step 3
Inform the OMC operator that the BTS is ready for on-line commissioning tests.