Release 3.3, Revision A 1/99
82 WAVEXpress/BTS Installation and Commissioning Guide
Step 4
If the Abis timeslot was changed, the WAVEXpress must be rebooted. Type:
bts
:A->
reboot
5-2 Prerequisites to Daisy Chaining
Step 1
Ensure that all WAVEXpresses comprising the daisy chain are installed and off-line commissioned.
Step 2
Ensure that the Abis Manager timeslot has been set for each WAVEXpress/BTS in the daisy chain as
outlined in Section 10-1. Each BTS within this daisy chain MUST be allocated a different Abis timeslot
number.
Step 3
Turn the power off to all units.
Step 4
Verify that all T1 lines are in place and commissioned by the operator from the BSC to the first BTS,
and between all successive BTS comprising the daisy chain.
NOTE
In the case of daisy chained WAVEXpresses, the Abis timeslot for each unit in the
daisy chain must be set to a different number. For example:
BTS 1 in the chain = Set timeslot 16 as the Abis timeslot
BTS 2 in the chain = Set timeslot 17 as the Abis timeslot
BTS 3 in the chain = Set timeslot 18 as the Abis timeslot
BTS 4 in the chain = Set timeslot 19 as the Abis timeslot
Make sure that this information is communicated to the OMC operator.
NOTE
For daisy chained WAVEXpresses, the T1 card(s) of the WAVEXpress machine
automatically enters a by-pass mode in the event of a power loss. The card is
equpped with a relay in the signal path which provides continuity between the A-
port and the B-port connector pins. In the event of a power outage, the A-port Rx
signal from a remote destination is presented at the B-port Tx pins; the A-port Tx
signal is driven from the B-port Rx pins by the remote source.