Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3, Revision A 1/99
80 WAVEXpress/BTS Installation and Commissioning Guide
Rebooting the BTS after Running POST
Step 1
Ty pe :
bts:A->
reboot
This action places the TRX in an on-line and operational state.
Step 2
Reconnect all T1 lines to the BTS.
Disconnecting the Serial Connection
Step 1
This completes the running of the POST diagnostics. If the Racal tests described in the BSS Field Main-
tenance Guide are going to be performed at this point, ensure that you have rebooted the BTS. In addi-
tion, leave the Craft PC connected to the BTS and a serial connection open.
Step 2
If the Racal tests are not performed at this point, end the serial connection. To do this, place your cur-
sor in the XTerm window which was used to establish a serial connection, and press the [~] key and
the [.] key at the same time. This terminates the serial connection between the Craft PC and the BTS.
Step 3
After a few seconds the returned message should read Disconnected, and the prompt should revert
to:
build@craftPC:->
NOTE
☛
There are three additional tests which are not run but show up in the results section
when the user manually retrieves the POST results. These tests are not displayed
when running POST by rebooting the BTS. They are:
• T1(1) TID08: CPM Download Test : Not-Run
• T1(1) TID09: Ping Test: Not-Run
• T1(1) TID10: Cross Connect Test: Not-Run