Installation Manual

Table Of Contents
Release 3.3, Revision A 1/99
80 WAVEXpress/BTS Installation and Commissioning Guide
Rebooting the BTS after Running POST
Step 1
Ty pe :
bts:A->
reboot
This action places the TRX in an on-line and operational state.
Step 2
Reconnect all T1 lines to the BTS.
Disconnecting the Serial Connection
Step 1
This completes the running of the POST diagnostics. If the Racal tests described in the BSS Field Main-
tenance Guide are going to be performed at this point, ensure that you have rebooted the BTS. In addi-
tion, leave the Craft PC connected to the BTS and a serial connection open.
Step 2
If the Racal tests are not performed at this point, end the serial connection. To do this, place your cur-
sor in the XTerm window which was used to establish a serial connection, and press the [~] key and
the [.] key at the same time. This terminates the serial connection between the Craft PC and the BTS.
Step 3
After a few seconds the returned message should read Disconnected, and the prompt should revert
to:
build@craftPC:->
NOTE
There are three additional tests which are not run but show up in the results section
when the user manually retrieves the POST results. These tests are not displayed
when running POST by rebooting the BTS. They are:
T1(1) TID08: CPM Download Test : Not-Run
T1(1) TID09: Ping Test: Not-Run
T1(1) TID10: Cross Connect Test: Not-Run