Installation Manual
Table Of Contents
- WAVEXpress/BTS Installation and Commissioning Guide
- One - Unpacking the WAVEXpress/BTS
- Two - Internal BTS Cabling and Jumpering
- Three - Installation
- 3-1 Wall Installation
- 3-2 Table Mount
- 3-3 Rack Installation
- 3-4 Common Final Installation Procedures
- 3-4.1 Connection of the Cable Gland
- 3-4.2 Connection of the Grounding Cable
- 3-4.3 Connection of the Antennas to the Bulkhead Plate
- 3-4.4 Connection of the Optional Combiner Assembly
- 3-4.5 Connection of the Power Supply
- 3-4.6 Connection of the T1 Lines
- 3-4.7 Connection to External Alarms
- 3-4.8 Optional Voltage Standing Wave Ratio (VSWR) Check
- 3-4.9 Post Installation Checks
- 3-5 Outdoor Installation
- Four - Off-Line Commissioning
- Five - Off-Line Commissioning of a Daisy Chain
- Six - Post Off-Line Commissioning
- Seven - On-Line Commissioning
- Appendix 1 - Connection of the Combiner Assembly
- Appendix 2 - BTS Field Maintenance
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- A2-1.1 Replacing the WAVEXpress/BTS IWP card
- A2-1.2 Replacing the WAVEXpress/BTS T1 card
- A2-1.3 Replacing the WAVEXpress/BTS TRX card
- A2-1.4 Replacing the WAVEXpress/BTS RF distribution card
- A2-1.5 Replacing the clock module
- A2-1.6 Replacing power supply units
- A2-1.7 Replacing fan assemblies
- A2-1.8 Replacing filters (p/n 520081-01)
- A2-1.9 Replacing the antenna bracket with a combiner assembly
- A2-1 WAVEXpress/BTS Field Replacement Maintenance
- Checklist 1 - Installation Checklist
- Checklist 2 - Commissioning Checklist
Release 3.3, Revision A 1/99
Off-Line Commissioning 79
Reviewing POST Results
This section explains how to review T1 POST and TRX POST diagnostics results after POST has been completed on
the WAVEXpress/BTS.
Step 1
To display the most current T1 and TRX POST results after POST has been completed, type:
bts:A->
postReportE1Trx
[ENTER]
A summary of the T1 and TRX POST results will be displayed (note that some tests may not run):
NOTE
☛
If a particular TRX card fails the POST diagnostics, remove the failed card and return it
to interWAVE Communications, Inc. along with its test results file. The defective
module needs to be replaced by a new one, and POST diagnostics should be run
again on the new card.
NOTE
☛
The following procedure assumes that T1 and TRX POST have just been completed
on the selected WAVEXpress/BTS and a serial connection is still active between the
Craft PC and the BTS. If this is not the case, reboot the BTS and run POST again.
Figure 4-10:
Reviewing T1 and TRX POST results
bts:A-> postReportE1Trx
******************* E1 DIAGNOSTICS REPORT *******************
*************************************************************
Slot:1
E1(1)TID01: Init Peripheral Registers : PASS
E1(1)TID02: Peripheral Register test : PASS
E1(1)TID03: Framer Register Test : PASS
E1(1)TID04: VME to CPU FIFO Flag Test : PASS
E1(1)TID05: Initialize Time/Space sw Chip : PASS
E1(1)TID06: Software Download Test : PASS
E1(1)TID07: Memory Test : PASS
E1(1)TID08: CPM download Test : Not-Run
E1(1)TID09: Ping Test : Not-Run
E1(1)TID10: Cross Connect Test : Not-Run
*************************************************************
******************* TRX DIAGNOSTICS REPORT ******************
*************************************************************
Slot 6
-------------------------------------------------------------
All Tests PASSED
*************************************************************
value=58=0x3a=’=”