User's Manual
Table Of Contents
- InterReach picoBTS Installation and Commissioning Guide
- TABLE OF CONTENTS
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- Chapter 3 - Commissioning and Configuration
- Chapter 4 - On-Line Testing
InterReach picoBTS Installation Guide Page 19
© 2008, ADC Telecommunications, Inc.
ADCP-77-061 • Issue A • 08/2008 • Chapter 2 - Installation
2.7 POST INSTALLATION CABLING AND CHECKS
Before proceeding to the next chapter and commissioning the equipment, make sure that:
• The chassis and mounting rack are properly grounded.
• The power cable is properly connected to the chassis and input power supply.
• The chassis power is turned off.
Preliminary