User's Manual

InterReach picoBTS Installation Guide Page 19
© 2008, ADC Telecommunications, Inc.
ADCP-77-061 • Issue A • 08/2008 • Chapter 2 - Installation
2.7 POST INSTALLATION CABLING AND CHECKS
Before proceeding to the next chapter and commissioning the equipment, make sure that:
The chassis and mounting rack are properly grounded.
The power cable is properly connected to the chassis and input power supply.
The chassis power is turned off.
Preliminary