User Manual

Table Of Contents
FlexWave microBTS Installation and Commissioning Guide Page 41
© 2009, ADC Telecommunications, Inc.
ADCP-77-086 • Issue 2 • 04/2009 • Chapter 5 - microBTS Initial Configuration
5.1 Equipment and Information Required for Initialization
The following equipment and information will be needed to initialize the microBTS:
Windows XP based PC loaded with BTS Installer and BSC Configuration Manager
utilities.
Four port Ethernet router or switch.
Quantity 2 each, RJ-48 Cat 5 patch cables (length according to site requirements).
RF termination (dummy load), 0-2 GHz, 50 Ohm, 20 watt capacity if no antenna system is
connected.
Static IP addresses for the microBTS assigned by your network administrator (2 addresses
will be needed for 1 x 1 configurations. 3 addresses for 2 x 1 configurations).
OML (operations and maintenance link) link address assigned by your network
administrator.
Subnet mask and default gateway IP addresses assigned by your system administrator.