User Manual
Table Of Contents
- FlexWave microBTS 1 x 1 and 2 x 1 Installation and Commissioning Guide
- Chapter 1 - Introduction
- Chapter 2 - Unpacking and Inspection
- Chapter 3 - Mounting Procedures
- Chapter 4 - Installation Procedures
- 4.1 Installation Overview
- 4.1.1 Installation Hardware Provided with microBTS Enclosure
- 4.1.2 Tools and Materials Required
- 4.1.3 Ground Wire Installation
- 4.1.4 Network Listen Antenna Installation
- 4.1.5 IP Backhaul Cable Installation
- 4.1.6 Base Station Antenna Cable Installation
- 4.1.7 AC Power Wiring Installation
- 4.1.8 DC Power Wiring Installation
- 4.1.9 Touch-Up Painting
- 4.1.10 Shield Installation (option)
- 4.2 microBTS Replacement
- 4.1 Installation Overview
- Chapter 5 - microBTS Initial Configuration
FlexWave microBTS Installation and Commissioning Guide Page 41
© 2009, ADC Telecommunications, Inc.
ADCP-77-086 • Issue 2 • 04/2009 • Chapter 5 - microBTS Initial Configuration
5.1 Equipment and Information Required for Initialization
The following equipment and information will be needed to initialize the microBTS:
• Windows XP based PC loaded with BTS Installer and BSC Configuration Manager
utilities.
• Four port Ethernet router or switch.
• Quantity 2 each, RJ-48 Cat 5 patch cables (length according to site requirements).
• RF termination (dummy load), 0-2 GHz, 50 Ohm, 20 watt capacity if no antenna system is
connected.
• Static IP addresses for the microBTS assigned by your network administrator (2 addresses
will be needed for 1 x 1 configurations. 3 addresses for 2 x 1 configurations).
• OML (operations and maintenance link) link address assigned by your network
administrator.
• Subnet mask and default gateway IP addresses assigned by your system administrator.