User Manual
Table Of Contents
- FlexWave microBTS 1 x 1 and 2 x 1 Installation and Commissioning Guide
- Chapter 1 - Introduction
- Chapter 2 - Unpacking and Inspection
- Chapter 3 - Mounting Procedures
- Chapter 4 - Installation Procedures
- 4.1 Installation Overview
- 4.1.1 Installation Hardware Provided with microBTS Enclosure
- 4.1.2 Tools and Materials Required
- 4.1.3 Ground Wire Installation
- 4.1.4 Network Listen Antenna Installation
- 4.1.5 IP Backhaul Cable Installation
- 4.1.6 Base Station Antenna Cable Installation
- 4.1.7 AC Power Wiring Installation
- 4.1.8 DC Power Wiring Installation
- 4.1.9 Touch-Up Painting
- 4.1.10 Shield Installation (option)
- 4.2 microBTS Replacement
- 4.1 Installation Overview
- Chapter 5 - microBTS Initial Configuration
Page 28 FlexWave microBTS Installation and Commissioning Guide
© 2009, ADC Telecommunications, Inc.
ADCP-77-086 • Issue 2 • 04/2009 • Chapter 4 - Installation Procedures
6 Cut the ground wire to length and connect it to the earth ground source as specified by
local code or practice.
4.1.4 Network Listen Antenna Installation
The microBTS is shipped with a Network Listen antenna. A temporary dust proof cap is
installed at the factory for protection during shipment. Remove the temporary cap and install
the Network Listen antenna (included with the microBTS accessories) by threading it onto the
NMO connector located on the top of the microBTS as shown in Figure 4-2. Tighten antenna
by hand until secure.
Figure 4-1: Connecting the Grounding Cable to the Enclosure
GROUND
LUG
FLAT
WASHER
SOCKET