Page 26 FlexWave microBTS Installation and Commissioning Guide
© 2009, ADC Telecommunications, Inc.
ADCP-77-086 • Issue 2 • 04/2009 • Chapter 4 - Installation Procedures
4.1 Installation Overview
Installation of the microBTS consists of the following basic steps:
1 Connecting a grounding cable to the microBTS grounding point.
2 Installing Network Listen antenna.
3 Connecting the IP backhaul cable.
4 Connecting the base station antenna coaxial cable to the microBTS antenna port.
5 Installing the AC/DC power cable and connecting it to the microBTS power port.
6 Installing the optional solar shields.
4.1.1 Installation Hardware Provided with microBTS Enclosure
The installation hardware that is provided with the microBTS is listed in Table 4-1.
E
Note: To insure that all connectors and ports remain dust-free during installation, leave all dust caps
and dust protectors in place until directed to remove them.
Note: If the microBTS will be horizontally mounted, provide drip loops for all cables that connect to
the enclosure.
Table 4-1: microBTS Installation Hardware
Item Quantity
M8 x 10 hex socket capscrew (for grounding cable) 1
M8 washer (for grounding screw) 1
Grounding cable (1.5 m) 1
AC Power Cable (20 feet) 1
Network Listen antenna 1
Front shield1 (option) 1
Side shield2 (option) 2
3/8-inch hex standoff 7
3/8-inch 10-32 screw with T25 TORX drive 7
#10 split washer 7