User's Manual Part 2
Table Of Contents
- SECTION 7 Installing Fusion
- SECTION 8 Replacing Fusion Components
- SECTION 9 Maintenance, Troubleshooting, and Technical Assistance
- APPENDIX A Cables and Connectors
- A.1 75 Ohm CATV Cable
- A.2 Fiber Optical Cables
- A.3 Coaxial Cable
- A.4 Standard Modem Cable
- A.5 TCP/IP Cross-over Cable
- A.6 DB-25 to DB-9 Null Modem Cable
- APPENDIX B Compliance
- B.1 Fusion System Approval Status
- B.2 Human Exposure to RF
- APPENDIX C Faults, Warnings, Status Tables
- C.1 Faults Reported by Fusion Main/SingleStar Hubs
- C.2 Faults Reported for System CPU
- C.3 Faults for Fusion Expansion Hubs
- C.4 Faults for RAUs
- C.5 Warning/Status Messages for Fusion Main/SingleStar Hubs
- C.6 Warning/Status Messages for System CPUs
- C.7 Warning/Status Messages for Fusion Expansion Hubs
- C.8 Warning /Status Messages for RAUs
Help Hot Line (U.S. only): 1-800-530-9960 7-35
D-620610-0-20 Rev A
CONFIDENTIAL
Fusion Installation Procedures
The label is the system name displayed next to the icons and used in messages.It
can be up to 32 characters long depending upon the firmware version.
The default system label is “Fusion” and will be used if you enter nothing.
7.
Type in a Date and Time or leave the current system date and time unchanged.
Enter time is a 24-hour format.
8.
Use the next section to schedule a System Test.
This section allows you to do the following:
• Click the check box to enable this feature.
• Click the check box to cause system test on power up.
• Enter values to schedule the date and time of the next system test.
• Enter values to specify the recurrence of the test by day or by week.
Schedule System Test allows periodic, automatic execution of the system
end-to-end test. Just like Perform System Test, a Schedule System Test suspends
normal service for the duration of the test; calls are dropped, and no new calls can
be established during the test. Test duration depends on the configuration (number
of RAUs) and requires one or two minutes to complete.
After completion of the system test, the scheduled system test time is updated to
the next test time, and an event log entry is made.
9.
Use the scroll bar on the left side of the page to scroll down to view the rest of the
page as shown in Figure 7-15.
Figure 7-15
AdminBrowser Configuration Window (continued)
10.
In the Band area, do the following: