User's Manual
Table Of Contents
- Table of Contents
- Preface
- InterReach Fusion Wideband System Description
- System Overview
- System Hardware
- System OA&M Capabilities
- System Connectivity
- System Operation
- System Specifications
- RF End-to-End Performance
- 2100/1800 RAU (FSN-W1-2118-1)
- 2100 HP/1800 HP (FSN-W1-2118-1-HP)
- 2100 HP/2600 HP (FSN-W1-2126-1-HP)
- 2100 High Power RAU (FSN-W1-21HP-1)
- 1900/AWS RAU (FSN-W1-1921-1)
- 800/850/1900 RAU (FSN-W2-808519-1)
- 700/AWS RAU (FSN-W2-7021-1)
- 700/700 (Upper C) MIMO RAU (FSN-W2-7575-1)
- 700/700 (Lower ABC) MIMO RAU (FSN-W2-7070-1)
- 700 ABC/AWS HP/AWS HP RAU (FSN-W4-702121-1-HP)
- 700 UC/AWS HP/AWS HP RAU (FSN-W4-752121-1-HP)
- 850/1900 HP/AWS HP RAU (FSN-W5-851921-1-HP)
- 2500/2500 RAU (FSN-2525-1-TDD)
- 2600/2600 RAU (FSN-W3-2626-1)
- Fusion Wideband Main Hub
- Fusion Wideband Expansion Hub
- Remote Access Unit
- Designing a Fusion Wideband Solution
- Design Overview
- Downlink RSSI Design Goal
- Maximum Output Power Per Carrier
- 700/AWS RAU (FSN-W2-7021-1)
- 700 MHz (Upper C) MIMO RAU (FSN-W2-7575-1)
- 700 MHz (Lower ABC) MIMO RAU (FSN-W2-7070-1)
- 700 ABC/AWS HP/AWS HP RAU (FSN-W4-702121-1-HP)
- 700 UC/AWS HP/AWS HP RAU (FSN-W4-752121-1-HP)
- 800/850/1900 RAU (FSN-W2-808519-1)
- 850/1900 HP/AWS HP RAU (FSN-W5-851921-1-HP)
- 1900/AWS RAU (FSN-W1-1921-1)
- 2100/1800 RAU (FSN-W1-2118-1)
- 2100 HP/1800 HP RAU (FSN-W1-2118-1-HP)
- 2100 HP/2600 HP RAU (FSN-W1-2126-1-HP)
- 2100 High Power RAU (FSN-W1-21HP-1)
- 2500/2500 TDD RAU (FSN-2525-1-TDD)
- 2600 MHz MIMO RAU (FSN-W3-2626-1)
- Designing for Capacity Growth
- System Gain
- Estimating RF Coverage
- Link Budget Analysis
- Optical Power Budget
- Connecting a Main Hub to a Base Station
- Installing Fusion Wideband
- Installation Requirements
- Safety Precautions
- Preparing for System Installation
- Installing a Fusion Wideband Main Hub
- Installing a Fusion Wideband Main Hub in a Rack
- Installing an Optional Cable Manager in the Rack
- Installing a Main Hub Using the 12” Wall-Mounted Rack (PN 4712)
- Installing a Fusion Wideband Main Hub Directly to the Wall
- Connecting the Fiber Cables to the Main Hub
- Making Power Connections
- Optional Connection to DC Power Source
- Power on the Main Hub
- Installing Expansion Hubs
- Installing the Expansion Hub in a Rack
- Installing an Expansion Hub Using the 12” Wall-Mounted Rack
- Installing an Expansion Hub Directly to the Wall
- Installing an Optional Cable Manager in the Rack
- Powering on the Expansion Hub
- Connecting the Fiber Cables to the Expansion Hub
- Connecting the 75 Ohm CATV Cables
- Troubleshooting Expansion Hub LEDs During Installation
- Installing RAUs
- Configuring the Fusion Wideband System
- Splicing Fiber Optic Cable
- Interfacing the Fusion Wideband Main Hub to an RF Source
- Connecting a Fusion Wideband Main Hub to an In-Building BTS
- Connecting a Duplex Base Station to a Fusion Wideband Main Hub
- Connecting a Fusion Wideband Main Hub RF Band to Multiple BTSs
- Connecting a Fusion Wideband Main Hub to a Roof-Top Antenna
- Connecting a Fusion Wideband Main Hub to Flexwave Focus
- Connecting Multiple Fusion Wideband Main Hubs to an RF Source
- Connecting Contact Alarms to a Fusion Wideband System
- Alarm Monitoring Connectivity Options
- Replacing Fusion Wideband Components
- Maintenance and Troubleshooting
- Appendix A: Cables and Connectors
- Appendix B: Compliance
- Appendix C: Faults, Warnings, Status Tables for Fusion, Fusion Wideband, Fusion SingleStar
- Appendix D: Contacting TE Connectivity
Table of Contents
InterReach Fusion Wideband Installation, Operation, and Reference Manual Page v
TECP-77-044 • Issue 9 • March 2015 © 2015 TE Connectivity Ltd.
Installing Fusion Wideband ____________________________________________________ 105
Installation Requirements.................................................................................................................................................... 107
Component Location Requirements.......................................................................................................................................107
Cable and Connector Requirements.......................................................................................................
................................107
Distance Requirements ..........................................................................................................................................................108
Safety Precautions ............................................................................................................................................................... 109
Installation Guidelines.............................................................................................................
...............................................109
General Safety Precautions ....................................................................................................................................................109
Fiber Port Safety Precautions .........................................................................................................
........................................110
Preparing for System Installation......................................................................................................................................... 111
Pre-Installation Inspection .....................................................................................................................................................111
Installation Checklist................................................................................................................
...............................................111
Tools and Materials Required.................................................................................................................................................113
Optional Accessories ..............................................................................................................................................................114
Installing a Fusion Wideband Main Hub ............................................................................................................................... 115
In
stalling a Fusion Wideband Main Hub in a Rack..................................................................................................................115
Installing an Optional Cable Manager in the Rack..................................................................................................................116
Installing a Main Hub Using the 12” Wall-Mounted Rack (PN 4712) .....................................................................
................116
Installing a Fusion Wideband Main Hub Directly to the Wall.................................................................................................117
Connecting the Fiber Cables to the Main Hub .......................................................................................................................118
Prepare the Fiber Cables ............................................................................................................
....................................118
Clean the Fiber Ports ......................................................................................................................................................118
Using Compressed Air.............................................................................................................................................118
Using Isopropyl Alcohol ..............................................................................................................
............................118
Cleaning the Fiber Ends ..................................................................................................................................................119
Testing the Fiber Cables .................................................................................................................................................119
Connecting the Fiber Cables...........................................................................................................
................................119
If the fiber jumper is labeled with 1 or 2 ................................................................................................................119
If the Fiber Jumper is Color-Coded .........................................................................................................................120
Making Power Connections............................................................................................................
........................................120
AC Powered Main Hub ...................................................................................................................................................120
DC Powered Main Hub and Expansion Hub....................................................................................................................120
Optional Connection to DC Power Source..............................................................................................
................................123
Power on the Main Hub .........................................................................................................................................................126
Installing Expansion Hubs .................................................................................................................................................... 127
Installing the Expansion Hub in a Rack ...............................................................................................
....................................127
Installing an Expansion Hub Using the 12” Wall-Mounted Rack ............................................................................................128
Installing an Expansion Hub Directly to the Wall ...................................................................................................................129
Installing an Optional Cable Manager in the Rack......................................................................................
............................129
Powering on the Expansion Hub ........................................................................................................
....................................130
Connecting the Fiber Cables to the Expansion Hub ...............................................................................................................130
Prepare the Fiber Cables ............................................................................................................
....................................130
Connect the Fiber Cables............................................................................................................
....................................130
If the Fiber Jumper Is Labeled with 1 or 2 ..............................................................................................................130
If the Fiber Jumper Is Color-Coded.....................................................................................................
....................131
Connecting the 75 Ohm CATV Cables.....................................................................................................
................................131
Troubleshooting Expansion Hub LEDs During Installation .................................................................................
....................132
Installing RAUs.....................................................................................................................................................................
133
RAU Installation Notes.................................................................................................................
...........................................133
Installing Passive Antennas .........................................................................................................
...........................................133
Location ...............................................................................................................................
...........................................133
800/850 MHz Isolation Requirements....................................................................................................
........................134
800 MHz iDEN Downlink and 850 MHz Cellular Uplink ......................................................................................
............135
850 MHz Cellular Downlink and 900 MHz iDEN Uplink
..................................................................................................135
Connecting the Antenna to the RAU ......................................................................................................
................................136
Connecting the CATV Cable............................................................................................................
........................................136
Troubleshooting Using RAU LEDs During Installation.....................................................................................
........................137